top of page

Loading

Show Map

KFC Kokstad Fit-Out Project

Jan - 2018

2 Months

Project Management

The newly built KFC is located in Kokstad Engen 1 stop Mount Currie. The new store was to be built according to the latest MBFK standards. The project was managed through stage 1 to 6 (Inception to Close-out) in a matter of 2 months.

  • Inception and conceptual design stages consisted out of developing the project’s scope and battery limits with all relevant stakeholders: Project inception with the client to initial plan approvals from YUM. These stages ran slightly parallel to fast-track the stages to achieve the proposed Go-live date.
  • Detailed design and procurement stages consisted out of defining all particulars for the full scope and setting up a detailed BOQ on which a competitive tender process was executed. The received tenders were adjudicated and all successful contractors appointed.
  • The construction stage commenced after appointments of the main and direct-contractors.
  • The close-out stage ensured all snags were completed on the store ensuring strict convergence on the KFC MBFK standards. The client was supplied with the necessary hand over documentation and a fully operational store ready for trading.
bottom of page